Application of mining-width‑constrained openpit mine production scheduling problem to the medium‑term planning of Radomiro Tomic Mine: A case study

Authored by:
Gonzalo Sepulveda, Juan L. Yarmuch

Medium- and short-term mine planning holds immense significance in optimizing production and resource utilization. It serves as a vital link between the long-term strategic plans and the day-to-day operational activities of a mine. In this context, a mathematical formulation is proposed to incorporate mining width constraints into the production scheduling process, aiming to maximize the net prese...