June 2019
Volume 71    Issue 6

New approaches and technology for tailings pipeline design and operation

Mining Engineering , 2019, Vol. 71, No. 6, pp. 32-32
Stowe, J; Cooke, R.


PREVIEW:

While there has been continual improvement in the models for predicting deposition velocity and pipeline friction losses, the fundamental design philosophy for tailings pipelines has remained the same over the previous three or four decades: design the tailings pipeline to operate in turbulent flow without a deposit on the pipe invert for all expected process conditions. Recent improvements in the understanding of slurry pipeline flows allows for the design of pipelines operating with a deposit on the pipe invert, allowing the system to operate at moderate velocities for high flow rates, optimizing system energy requirements and maximizing pipeline wear life.  



Please login to access this article.

OR

If you are not an SME member, you can join SME by clicking the button below.