March 2000
Volume 52    Issue 3

Centrilift overhauls water system at Nevada copper mine

Mining Engineering , 2000, Vol. 52, No. 3, pp. 19-19


PREVIEW:
Centrilift was contracted to provide electric submersible pumps for Equatorial Mining’s new copper mine in Nevada. However, the submersible pump company ended up coordinating the modification of the mine’s entire water system.


Please login to access this article.

OR

If you are not an SME member, you can join SME by clicking the button below.