April 2012
Volume 64    Issue 93

How to deal with blocked chutes in mining applications

Mining Engineering , 2012, Vol. 64, No. 93, pp. 53-53


PREVIEW:

A relatively new and large export thermal coal mine, located in the Hunter Valley region of Australia, produces in excess of 9.1 Mt/a (10 million stpy).

This coal handling preparation plant (CHHP) was experiencing problems in production because of intermittent tripping of conveyors caused by the blocked chute switches in the head conveyor transfer chutes.
 



Please login to access this article.

OR

If you are not an SME member, you can join SME by clicking the button below.