ME home
 
  SME FaceBook SME Twitter SME LinkedIn RSS Feed

Subscriber or
SME Member Log On

WEB-ONLY CONTENT

Go to SME eNEWS

MINING INDUSTRY EVENTS

Copper 2019  - Conference
Aug 18, 2019 - Aug 21, 2019
AIMEX  - Exhibit
Aug 27, 2019 - Aug 29, 2019
6th Internatl Congress on Environment and Soc Resp  - Conference
Sep 4, 2019 - Sep 6, 2019
Future of Mining EMEA 2019  - Conference
Sep 4, 2019 - Sep 5, 2019

METAL PRICES


Au
Ag
Pt
Pd
Ni
Cu
Al
Pb

AGGREGATES
AND MINERALS
MARKETPLACE


http://aggregatesmineralsmarketplace.com
The Mining Engineering, SME and NSSGA
Online Buyers Directory Site
The Online Global Mining and Minerals Library Site
June 2019
Volume 71    Issue 6

Final design of the River Des Peres tunnel in St. Louis, MO

Mining Engineering, 2019, Vol. 71, No. 6, pp. 105-105
Pride, Patricia; Robison, Mike; Bergenthal, Jon; Klecan, Wojciech


PREVIEW:

The Lower and Middle River Des Peres (LMRDP) CSO Storage Tunnel is the largest single component of Metropolitan St. Louis Sewer District’s (MSD) CSO control system improvements planned to meet consent decree requirements for MSD’s Lemay Service Area. The 13.7-km (8.5-mile) long, deep, hard rock tunnel will have a finished diameter of 9.1 m (30 ft). Beginning at the Lemay Wastewater Treatment Plant (WWTP), the alignment follows the channelized River Des Peres to the outfall of the existing Forest Park tubes, as indicated in Fig. 1. 



Please login to access this article.

OR

If you are not an SME member, you can join SME by clicking the button below.