ME home
 
  SME FaceBook SME Twitter SME LinkedIn RSS Feed

Subscriber or
SME Member Log On

WEB-ONLY CONTENT

Go to SME eNEWS

MINING INDUSTRY EVENTS

2017 George A. Fox Conference  - Conference
Jan 23, 2019
2019 SME Annual Conference & Expo  - Conference
Feb 24, 2019 - Feb 27, 2019
CMA 121st Nat'l Western Mining Conference  - Conference
Feb 24, 2019 - Feb 27, 2019
Fuutre of Mining Australia 2019  - Conference
Mar 25, 2019 - Mar 26, 2019

METAL PRICES


Au
Ag
Pt
Pd
Ni
Cu
Al
Pb

AGGREGATES
AND MINERALS
MARKETPLACE


http://aggregatesmineralsmarketplace.com
The Mining Engineering, SME and NSSGA
Online Buyers Directory Site
The Online Global Mining and Minerals Library Site
December 2018
Volume 70    Issue 12

Cross passage freezing from the ground surface

Mining Engineering, 2018, Vol. 70, No. 12, pp. 103-103
McCain, Aaron; Cook, Brenton; Long, Nate; Applegate, Larry


PREVIEW:

The Northgate Link Extension project is the third phase of the Sound Transit master plan to extend light rail throughout the greater Seattle metropolitan area. When completed, the Northgate Link Extension will extend the existing light rail system north by about 7 km (4.3 miles) from the University of Washington to the Northgate neighborhood. A general overview of the project alignment is provided as Fig. 1. The project was funded by a combination of federal grants and allocations from local taxes. The general contractor on the project was JCM Northlink LLC (JCM), a joint venture between Jay Dee Contractors, Frank Coluccio Construction Company and Michels Corp. SoilFreeze, Inc. was retained as a subcontractor to provide ground freezing design and construction services.
 



Please login to access this article.

OR

If you are not an SME member, you can join SME by clicking the button below.