ME home
 
  SME FaceBook SME Twitter SME LinkedIn RSS Feed

Subscriber or
SME Member Log On

WEB-ONLY CONTENT

Go to SME eNEWS

MINING INDUSTRY EVENTS

2017 George A. Fox Conference  - Conference
Jan 23, 2019
2019 SME Annual Conference & Expo  - Conference
Feb 24, 2019 - Feb 27, 2019
CMA 121st Nat'l Western Mining Conference  - Conference
Feb 24, 2019 - Feb 27, 2019
Fuutre of Mining Australia 2019  - Conference
Mar 25, 2019 - Mar 26, 2019

METAL PRICES


Au
Ag
Pt
Pd
Ni
Cu
Al
Pb

AGGREGATES
AND MINERALS
MARKETPLACE


http://aggregatesmineralsmarketplace.com
The Mining Engineering, SME and NSSGA
Online Buyers Directory Site
The Online Global Mining and Minerals Library Site
September 2017
Volume 69    Issue 9

Pump phase shift control in the world’s largest iron ore concentrate pipeline

Mining Engineering, 2017, Vol. 69, No. 9, pp. 31-31
van Rijswick, Ralph; Vlot, Erik


PREVIEW:

Anglo American operates 18 Weir GEHO piston diaphragm pumps (PD) in the two pump stations of the 52-km (32-mile) long Minas Rio iron ore concentrate pipeline. The pipeline is designed to transport 26.5 Mt/a (29.2 million stpy) of concentrate from the mine to the export terminal at the coast.
During the commissioning of the pipeline in the fall of 2014, high pressure pulsation levels were experienced, with peak-to-peak levels as high as 20 bar. Based on pressure readings it was concluded that hydraulic resonances were present in the system, which were excited by the third and sixth harmonic of the flow pulsation generated by the pumps. 



Please login to access this article.