ME home
 
  SME FaceBook SME Twitter SME LinkedIn RSS Feed

Subscriber or
SME Member Log On

WEB-ONLY CONTENT

Go to SME eNEWS

MINING INDUSTRY EVENTS

Solution Mining SMRI Fall Technical Conference  - Conference
Sep 24, 2017 - Sep 27, 2017
SME Florida Section 32nd Annual Conference  - Conference
Oct 11, 2017 - Oct 12, 2017
10th Edition of Great Step  - Conference
Oct 13, 2017 - Oct 15, 2017
AusIMM Underground Operators Conference  - Conference
Oct 16, 2017 - Oct 18, 2017

METAL PRICES


Au
Ag
Pt
Pd
Ni
Cu
Al
Pb

AGGREGATES
AND MINERALS
MARKETPLACE


http://aggregatesmineralsmarketplace.com
The Mining Engineering, SME and NSSGA
Online Buyers Directory Site
The Online Global Mining and Minerals Library Site
September 2017
Volume 69    Issue 9

Pump phase shift control in the world’s largest iron ore concentrate pipeline

Mining Engineering, 2017, Vol. 69, No. 9, pp. 31-31
van Rijswick, Ralph; Vlot, Erik


PREVIEW:

Anglo American operates 18 Weir GEHO piston diaphragm pumps (PD) in the two pump stations of the 52-km (32-mile) long Minas Rio iron ore concentrate pipeline. The pipeline is designed to transport 26.5 Mt/a (29.2 million stpy) of concentrate from the mine to the export terminal at the coast.
During the commissioning of the pipeline in the fall of 2014, high pressure pulsation levels were experienced, with peak-to-peak levels as high as 20 bar. Based on pressure readings it was concluded that hydraulic resonances were present in the system, which were excited by the third and sixth harmonic of the flow pulsation generated by the pumps. 



Please login to access this article.