ME home
 
  SME FaceBook SME Twitter SME LinkedIn RSS Feed

Subscriber or
SME Member Log On

WEB-ONLY CONTENT

Go to SME eNEWS

MINING INDUSTRY EVENTS

Geometallurgy 2018  - Conference
Aug 16, 2018 - Aug 17, 2018
Extraction 2018  - Conference
Aug 26, 2018 - Aug 29, 2018
World Congress on Computer Science, Machine learni  - Conference
Aug 30, 2018 - Aug 31, 2018
InterDrone  - Exhibit
Sep 5, 2018 - Sep 7, 2018

METAL PRICES


Au
Ag
Pt
Pd
Ni
Cu
Al
Pb

AGGREGATES
AND MINERALS
MARKETPLACE


http://aggregatesmineralsmarketplace.com
The Mining Engineering, SME and NSSGA
Online Buyers Directory Site
The Online Global Mining and Minerals Library Site
September 2015
Volume 67    Issue 9

Lake Mead intake No. 3: TBM tunneling at high pressure

Mining Engineering, 2015, Vol. 67, No. 9, pp. 135-135
Nickerson, Jim; Bono, Roberto; Cimiotti, Claudio; Moonin, Erika


PREVIEW:

In response to the severe drought on the Colorado River basin and in order to preserve existing water capacity to the Las Vegas Valley, the Southern Nevada Water Authority contracted a new deep-water intake (Intake No. 3) located in Lake Mead. The current project (Contract No. 070F-01-C1) includes 5 km (3 miles) of tunnel with very difficult geological conditions and a 200-m (650-ft) deep shaft and marine works. This paper will present the current status of the design-build contract being constructed by Vegas Tunnel Constructors and the challenges and problems faced and the innovative solutions developed to handle the difficult conditions encountered during tunneling with up to 15 bars of pressure.