ME home
 
  SME FaceBook SME Twitter SME LinkedIn RSS Feed

Subscriber or
SME Member Log On

WEB-ONLY CONTENT

Go to SME eNEWS

MINING INDUSTRY EVENTS

Al Azhar‚Äôs 14th International Conference on: Engin  - Conference
Dec 12, 2017 - Dec 14, 2017
WM2E 2017 Energy Tech Expo  - Exhibit
Dec 14, 2017 - Dec 16, 2017
George Fox Conference  - Conference
Jan 24, 2018
2018 SME Annual Conference & Expo  - Conference
Feb 25, 2018 - Feb 28, 2018

METAL PRICES


Au
Ag
Pt
Pd
Ni
Cu
Al
Pb

AGGREGATES
AND MINERALS
MARKETPLACE


http://aggregatesmineralsmarketplace.com
The Mining Engineering, SME and NSSGA
Online Buyers Directory Site
The Online Global Mining and Minerals Library Site
June 2015
Volume 67    Issue 6

Black River Tunnel project phase 1: Innovative quality control approach for installation and testing of rock bolts in shafts

Mining Engineering, 2015, Vol. 67, No. 6, pp. 113-115
Edberg, J.


PREVIEW:

This article details the use of an alternative testing method to the 2004 “Post-Tensioning Institute (PTI) Recommendations for Prestressed Rock and Soil Anchors” manual’s recommendations for temporary and permanent rock anchors for applications in shafts and tunnels. This method was developed and used for the Black River Tunnel (BRT) project in Lorain, OH as a means to reduce testing time of rock bolts during shaft construction while maintaining a similar level of quality control and assurance. The following sections will detail the project background, subsurface characteristics, shaft construction, the 2004 PTI testing method and associated difficulties, the alternative testing method and conclusions reached.



Please login to access this article.