ME home
 
  SME FaceBook SME Twitter SME LinkedIn RSS Feed

Subscriber or
SME Member Log On

WEB-ONLY CONTENT

Go to SME eNEWS

MINING INDUSTRY EVENTS

SEG International Expo and Annual Meeting  - Conference
Oct 14, 2018 - Oct 19, 2018
Miners and Technologies Americas  - Conference
Oct 15, 2018 - Oct 17, 2018
Tunneling Fundamentals, Practice and Innovations  - Short Course
Oct 15, 2018 - Oct 18, 2018
China Mining  - Conference
Oct 18, 2018 - Oct 20, 2018

METAL PRICES


Au
Ag
Pt
Pd
Ni
Cu
Al
Pb

AGGREGATES
AND MINERALS
MARKETPLACE


http://aggregatesmineralsmarketplace.com
The Mining Engineering, SME and NSSGA
Online Buyers Directory Site
The Online Global Mining and Minerals Library Site
June 2015
Volume 67    Issue 6

Black River Tunnel project phase 1: Innovative quality control approach for installation and testing of rock bolts in shafts

Mining Engineering, 2015, Vol. 67, No. 6, pp. 113-115
Edberg, J.


PREVIEW:

This article details the use of an alternative testing method to the 2004 “Post-Tensioning Institute (PTI) Recommendations for Prestressed Rock and Soil Anchors” manual’s recommendations for temporary and permanent rock anchors for applications in shafts and tunnels. This method was developed and used for the Black River Tunnel (BRT) project in Lorain, OH as a means to reduce testing time of rock bolts during shaft construction while maintaining a similar level of quality control and assurance. The following sections will detail the project background, subsurface characteristics, shaft construction, the 2004 PTI testing method and associated difficulties, the alternative testing method and conclusions reached.