ME home
 
  SME FaceBook SME Twitter SME LinkedIn RSS Feed

Subscriber or
SME Member Log On

WEB-ONLY CONTENT

Go to SME eNEWS

MINING INDUSTRY EVENTS

2017 George A. Fox Conference  - Conference
Jan 23, 2019
2019 SME Annual Conference & Expo  - Conference
Feb 24, 2019 - Feb 27, 2019
CMA 121st Nat'l Western Mining Conference  - Conference
Feb 24, 2019 - Feb 27, 2019
Fuutre of Mining Australia 2019  - Conference
Mar 25, 2019 - Mar 26, 2019

METAL PRICES


Au
Ag
Pt
Pd
Ni
Cu
Al
Pb

AGGREGATES
AND MINERALS
MARKETPLACE


http://aggregatesmineralsmarketplace.com
The Mining Engineering, SME and NSSGA
Online Buyers Directory Site
The Online Global Mining and Minerals Library Site
October 2000
Volume 52    Issue 10

Site development over an abandoned coal mine

Mining Engineering, 2000, Vol. 52, No. 10, pp. 10-12
Marino, Gennaro G.; Lumsden, Scott


PREVIEW:
During the preliminary design stages of the Illinois Division of Natural Resources (DNR) building, it was discovered that an old coal mine was present some 70 m (220 ft) beneath the building site. The new DNR building to be constructed is 36 m (120 ft) wide and 134 m (440 ft) long. It has three stories above grade and a basement level. The building is oriented north-south and has east and west ponds next to it (Fig. 1). The building is located on the State Fairgrounds in Springfield, IL.


Please login to access this article.

OR

If you are not an SME member, you can join SME by clicking the button below.