ME home
 
  SME FaceBook SME Twitter SME LinkedIn RSS Feed

Subscriber or
SME Member Log On

WEB-ONLY CONTENT

MINING INDUSTRY EVENTS

Flotation '13-Sixth International Flotation Sympos  - Call for Papers
May 3, 2013 - Jun 30, 2013
Arctic Technology Conference 2014  - Call for Papers
May 21, 2013 - Jun 13, 2013
SMRI Fall 2013 Technical Conference  - Call for Papers
May 21, 2013 - Jun 17, 2013
GAC-MAC Winnipeg 2013  - Conference
May 22, 2013 - May 24, 2013

METAL PRICES


Au
Ag
Pt
Pd
Ni
Cu
Al
Pb

AGGREGATES
AND MINERALS
MARKETPLACE


http://aggminmarketplace.com
The Mining Engineering, SME and NSSGA
Online Buyers Directory Site
The Online Global Mining and Minerals Library Site
September 2012
Volume 64    Issue 9

Design and construction challenges of hard rock TBMs at the Gotthard Base Tunnel

Mining Engineering, 2012, Vol. 64, No. 9, pp. 196-201
Rehbock-Sander, Michael; Boissonnas, Yves


PREVIEW:

The Gotthard Base Tunnel (GBT) is 57 km (35 miles) long and consists of two parallel single-track tubes with an excavation diameter ranging from 8.8 to 9.5 m (28.8 to 31.2 ft). These are interlinked by cross-passages every 312 m (1,000 ft). Two multifunction stations (MFS) are located in the sections Sedrun and Faido, at one-third and two-thirds of the entire tunnel length (Fig. 1). These will be used for the diversion of trains to the other main tube via tunnel crossovers, for the housing of technical infrastructure and equipment and for potential emergency stops.